カテゴリー:III. CONSTRUCTION OF THE FINAL CELLO
-
>SPECIAL EVENT III
HANDING OVER PROTOTYPE II TO THE MUSASHINO INSTRUMENT MUSEUM After the construction of the fina…詳細を見る -
CONSTRUCTION V / Neck; Varnish; Bridge; Tailpiece
(Note: From this point on the construction-process differs from the construction-process of a four string cell…詳細を見る -
CONSTRUCTION IV / Body
Construction IV / Assembly of the body (Note: Until indicated otherwise the following construction-process wi…詳細を見る -
FURTHER EXPERIMENTS WITH PROTOTYPE II
At this stage of the construction there was still time to draw some conclusions for the construction of the…詳細を見る -
>SPECIAL EVENT II
FIRST FACULTY DEVELOPMENT (FD) PRESENTATION OF THE PROJECT On July 15, 2014 Doll and Yamazaki introduced the …詳細を見る -
CONSTRUCTION III / Back; Top
Construction III / Back; Top Note: Until indicated otherwise the following construction-process will not di…詳細を見る -
CONSTRUCTION I / Form; Blocks
CONSTRUCTION I / Form; Blocks Note: Until indicated othereise the following construction-process will n…詳細を見る -
>SPECIAL EVENT I
FIRST INTRODUCTION OF THE PROTOTYPES TO THE PUBLIC When planning the 4th recital (2014, May 13th ) of the…詳細を見る -
CONSTRUCTION II / Bouts
CONSTRUCTION II / Bouts (Note: Until indicated otherwise the following construction-process will not diffe…詳細を見る -
MEETING [10] (October 11th, 2013)
After an extensive search Ueda found a cello that might be ideal as the model for the project’s final five …詳細を見る -
MEETING [9] (August 30th, 2013)
DISCUSSING THE MODEL The project’s research showed that there were almost countless types of cellos over t…詳細を見る -
THE MATERIAL
III. CONSTRUCTION OF THE FINAL INSTRUMENT The next step will be the construction of the third and final versi…詳細を見る